Pylon and Foundation Statics

Mast- und Fundamentstatik

In the field of transmission line construction and substations, we make static calculations for steel constructions and their foundations as well as the respective workshop drawings or shell and reinforcement plans including all respective services.

SAG

Our services

- Design of new transmission line pylons including the necessary proof of interval
- Static calculations of lattice steel pylons and substations to national and

  international regulations
- Creation of workshop drawings for lattice steel pylons and all steel constructions in

  substations
- Carrying out of building ground examinations with subsequent competent evaluation
- Determination of the optimal and most economical foundation type
- Drawing up of the static calculations for pylon foundations and foundations for all steel

  constructions in substations
- Creation of implementation plans with steel lists for all types of foundation
- Pylon measurements on site
- Development of economical refurbishment measures for existing lattice pylons and

  foundations
- Carrying out of the planning, drawing up of static calculations and creation of workshop

  drawings for telecommunication systems on transmission line pylons
- Test of static calculations for Deutsche Bahn AG by EBA-approved surveyors

SAG

Our strength

- Use of the latest software for drawing up static calculations and the creation of

  CAD drawings
- Long-standing experience and high competence
- High flexibility with customer requirements and deadlines

SAG

Advantages for our customers

- Drawing up of static calculations and creation of drawings from the pylon top to the

  foundation from one source
- Optimised and economical construction of transmission line pylons and switchgear

  reflecting of the customer's specifications
- Completion of the planning services on schedule in high quality