VE (Hydroelectric Power Plant) Štěchovice, TG1, TG2 and TG3 Control System Reconstruction (ČEZ, a.s. Vodní elektrárny)
Reconstruction of TG1, TG2 a TG3 control system and excitation after floods in VE Štěchovice.
Auftraggeber:
ČEZ, a.s. Vodní elektrárny (Major supplier – VA TECH HYDRO)
Ausführung:
01/2003 - 08/2004
Leistungen:
- Dismantle the existing equipment and control system cabling
- Install new control system cabinets and exciting assemblies TG1, TG2 and TG3, cabling and instrumentation